Watch the video
Watch the video
Watch the video
Watch the video
Watch the video
Watch the video
Watch the video
Watch the video
Watch the video
Watch the video
Watch the video
Watch the video
Watch the video
Watch the video
Watch the video
Watch the video
Watch the video
Watch the video
Watch the video
Watch the video
Watch the video
Watch the video
Watch the video
Watch the video
Watch the video
Watch the video
Watch the video
Watch the video
Watch the video
Watch the video

What has been done

For investors, the latest news from the construction site of the Premier Resort Hotel for September, 2020:

  • the plastering works of the number fund are completely completed;
  • work continues on the decoration of the conference room, restaurant, reception;
  • glazing of the boiler room completed;
  • the installation of the entrance group of the hotel and the entrance to the parking;
  • completed work on the arrangement of metal structures of window frames.

Construction work permit №ІФ112172511530 of 08.09.2017р. Issuing authority: Department of DABI in Ivano-Frankivsk region.

What has been done

For investors, the latest news from the construction site of the Premier Resort Hotel for August, 2020:

  • installation of panoramic elevators has begun;
  • work is underway to decorate the conference hall;
  • boiler room glazing started;
  • landscaping work continues;
  • the installation of the entrance group of the hotel has started.

Construction work permit №ІФ112172511530 of 08.09.2017р. Issuing authority: Department of DABI in Ivano-Frankivsk region.

What has been done

For investors, the latest news from the construction site of the Premier Resort Hotel for July 2020:

  • completed preparations for the installation of panoramic elevators and the installation of aluminum elevator structures;
  • the process of glazing of the SPA zone at the level of 1,2,3 sections and boiler rooms has been started;
  • landscaping work continues;
  • finishing work of the rooms and common areas continues.

Construction work permit №ІФ112172511530 of 08.09.2017р. Issuing authority: Department of DABI in Ivano-Frankivsk region.

What has been done

To the attention of investors, the next news from the construction site of the apart-hotel "Premier Resort Hotel" as of 12.07.2020:

  • preparations for the installation of panoramic elevators are underway.
  • installation of aluminum structures of the elevator proceeds.
  • installation of aluminum structures of the SPA-zone at the level of 1,2,3 sections and a boiler room proceeds.
  • development of marks on improvement of the territory is carried out.
  • finishing works of the number fund continue.

What has been done

For investors, the latest news from the construction site of the Premier Resort Hotel for May 2020:

  • a test run of the boiler room, heating, air conditioning and ventilation systems is carried out;
  • plastering works of the number fund have been started;
  • installation of gypsum cardboard in public places proceeds;
  • repair of the bridge proceeds.

What has been done

For investors, the latest news from the construction site of the Premier Resort Hotel for April 2020:

  • Work continues on building up the metal structures of the panoramic elevator.
  • installation of power to the elevator control unit.
  • preparation for the installation of panoramic elevators.
  • 100% completed installation of railings on balconies.
  • preparation for the glazing process of the 3rd section, boiler room and entrance group has begun.

What has been done

For investors, the latest news from the construction site of the Premier Resort Hotel for March 2020:

  • The boiler house automation process and the installation of heat fans have been completed.
  • Installation of railings on balconies continues.
  • The plastering works of the hotel room stock are continuing.
  • Installation of restaurant systems continues.
  • Preparatory work for the installation of elevators has begun.

What has been done

The latest news from the construction site of the Premier Resort Hotel for February 2020

  • 90% completed the installation of metal railings on balconies.
  • The process of tying heating boilers continues.
  • The installation of a second heating boiler and a bunker system for pallets has been completed.
  • Preparatory work for the installation of chimney systems has begun.
  • Installation of the receiver pallet system continues.
  • Completed roof section III.
  • Plasterboard walling continues.

What has been done

Regular news from the construction site of the Premier Resort Hotel

  • Installation of metal railings on balconies continues;
  • Installation of heating radiators is completed;
  • Installation of the second heating boiler and bunker system for pallets continues;
  • Preparatory work has begun for boiler strapping;
  • There is a roof overlap of the III section;
  • The plasterboard lining of wall partitions continues.

What has been done

Report from the construction of Premier Resort Hotel for December 2019:

  • 99% of the hotel's facade insulation and decoration is completed.
  • Continued installation of external and internal communications - water supply and sewerage.
  • Installation of metal structures of elevator shafts completed.
  • Installation of outdoor pool continues.

What has been done

For investors' information, another photo report from the construction site of the Premier Resort Hotel in October.

  • Continuous work continues on the third section of the hotel;
  • Installation of insulation and decoration of the hotel facade continues;
  • Installation of interior partitions, air conditioning and heating systems in the first section of the hotel continues;
  • Installation of external communications continues - water supply and sewage.

What has been done

Report from the construction of Premier Resort Hotel for September 2019:

  • Installation of insulation and decoration of the facade of the hotel continues.
  • Installation of roof rails and low tides has begun.
  • The acceptance of concrete and the pouring of the pool continue.
  • 100% complete installation of heating and underfloor heating on 2 sections of the hotel.
  • Installation of heating and underfloor heating on 1 section of the hotel continues.
  • Installation of smoke extraction systems from the boiler room is ongoing.
  • Installation of external communications - water supply and sewerage has started.

What has been done

The construction of the Premier Resort Hotel in August 2019:

  • work is underway to insulate and decorate the facade of the hotel;
  • installation of floor heating in the first and second sections has begun;
  • installation of ventilation and air conditioning systems in the first and second sections continues;
  • monolithic work on the third section continues.

What has been done

The construction of the Premier Resort Hotel in July 2019:

  • 100% complete installation of interior partitions in the first section;
  • works continue to insulate the facade of the hotel;
  • the plumbing works in the first and second sections are ongoing;
  • installation of ventilation and air-conditioning systems in the first and second sections is ongoing;
  • back sinus filling in the first section;
  • the monolithic work of the third section continues.

What has been done

The construction of the Premier Resort Hotel in June 2019:

  • sanitary works started in the second section;
  • the installation of ventilation systems in the second section continues;
  • installation of interiors partitions of the first section;
  • preparations are being made for the insulation of the facade;
  • monolithic works in the third section continue.

What has been done

Construction of the Premier Resort Hotel in May:

  • installation of drywall interior partitions continues at the level 2nd floor of the second section
  • installation of communications (water supply, heating and sewerage systems) and short-circuit cabling systems in the second section has begun
  • The installation of window constructions in the first section of the hotel continues.

What has been done

Construction of the Premier Resort Hotel as of 05.02.2019:

  • the installation of plasterboard interiors partitions is continued at the level of the 5th floor of the second section,
  • completed transfer of external walls by gasblock on the first section,
  • dismantling of the crane is completed.

What has been done

The construction of the Premier Resort Hotel:

  • 100% completed monolithic and frame work on the floors of the first and second sections
  • the transfer of the outer walls of the gas block to the first floor of the first section,
  • completed the work on the roof of the fence;
  • the assembly of the staircase and parapet in the first section completed;
  • 9 piles are immersed in the third section;
  • lasts knitting armature for fixing in the third section

What has been done

Your photo report:

  • 99% finished floor-to-wall monolithic work
  • Roofing work is ongoing
  • staircase installation
  • 100% complete preparation for the installation of the chimney system

What has been done

Despite the difficult weather conditions, construction work at the Premier Resort Hotel is actively underway

Another photo report from the construction site of the Premier Resort Hotel

  • The second floor of the first section of the hotel was built
  • Monolithic works are underway to block the first living floor of the first section of the hotel;
  • 100% complete installation of panoramic windows in the second section.

What has been done

Another photo report from the construction site of the Premier Resort Hotel

  • continues monolithic work at the level of the first residential floor of the first section of the hotel.
  • 100% availability of the second section of the staircase
  • 100% completed work in the technical rooms of the second section

What has been done

Difficult weather conditions did not affect the pace of construction of Premier Resort Hotel.

The process of concreting the floors of the first section of the hotel is actively going on now.

We introduce you to the photo report

  • 100% completed raising the vertical to zero on the first section
  • reinforcement is mated, formwork is placed and concrete is placed on the 1st floor of the first section
  • completed work on the development of soil drainage

What has been done

Construction work on the site of the Premier Resort Hotel:

  • drilling works on the first section on the 5th aggression continue
  • installation of piles and drainage tray in the first section
  • partially mounted vertically in the first section
  • 3 sections of the foundation plate are poured

What has been done

Continue to report on construction work on the Premier Resort Hotel site:

  • 100% completed work to strengthen the retaining wall,
  • concreting slab 3 sections,
  • completed concreting of technical premises of the 1st section of the 2nd scarp,
  • 100% complete the knitting of piles in section 1.

What has been done

Continue to report on construction work on the Premier Resort Hotel site

  • the retaining wall anchoring process continues
  • preparatory work is carried out for the ventilation and chimney part of the boiler room
  • the slab of the 1st and 2nd step of the second section is flooded
  • the process of installing the columns of the first section continues.

What has been done

Dear Investors, we continue to inform you about the dynamics of the construction of the Premier Resort Hotel:

  • the work on the anchoring of the retaining wall is ongoing;
  • 100% complete roof overlay, staircase cell monolith of all balconies of the second sections
  • 90% of the aggregate masonry was completed in the second section,
  • the work on the bay piles is underway, preparation for concreting the first section of the first section is under way,
  • is preparing for bundles of reinforcement of the second ledge of the first section.

What has been done

Dear Investors, we continue to inform you about the dynamics of the construction of the Premier Resort Hotel:

  • completed monolithic works of section ІІ
  • the process of erection of internal walls from the gas block at the level of the 4th floor of the II section continues;
  • the work of ground works under the pits І section;
  • preparatory work is under way for the immersion of the first-stage booster piles.

What has been done

Dear Investors, we continue to inform you about the dynamics of the construction of the Premier Resort Hotel:

  • the work on filling the ceiling above the 5th floor has been completed;
  • the process of laying the outer walls 2-4
  • excavation works on the 1st pillar excavation started;
  • excavation works near the retaining wall for the walk zone;
  • concreting of the retaining wall of the first section;
  • the monolithic part of the second floor of the boiler is flooded;
  • the construction of the formwork under the bridge is under way

What has been done

Work on the construction site boils! There are 5 floors of the hotel (parking, commercial and 3 dwellings). The arrangement of the structures under the fill of slab floor 6 floor is underway. Call or visit our office for detailed project information! Details in sales departments.

What has been done

Dear Investors and potential buyers of apartments. Premier Resort Hotel! For your attention, another photo report from the hotel's construction site. We value your confidence and implement our project dynamically! Work continues on the arrangement of the 5th floor of the hotel. Call or visit our office for project information!

What has been done

In February 2018, on the construction site were erected monolithic structures of the third floor and flooded floor slabs for the fourth. Reinforced concrete structures are warmed up with the help of powerful electronic heaters. From the side of the road there is a load-bearing wall with a height of 7.5 meters. In parallel, excavation works on a sample of soil for the installation of the boiler house and part of the parking. Filling the boiler room walls is complete. The completion of construction is scheduled for 2019. The work goes ahead of the schedule, despite the weather and climatic conditions. The next stage is the construction of monolithic structures of the fourth floor.

What has been done

At the construction site Premier Resort Hotel completed work on filling the ceiling of the third floor and started - with the installation of the frame of the 4th floor!

We remind you that the number of rooms is rapidly decreasing, book an overview of the building or book apartments on the phone + 38- 068-394-00-44.

Stay up informed – be the first to learn about the “Premier Resort” news!

* No spam, notifications only