What has been done

Another photo report from the construction site of the Premier Resort Hotel

  • continues monolithic work at the level of the first residential floor of the first section of the hotel.
  • 100% availability of the second section of the staircase
  • 100% completed work in the technical rooms of the second section

What has been done

Difficult weather conditions did not affect the pace of construction of Premier Resort Hotel.

The process of concreting the floors of the first section of the hotel is actively going on now.

We introduce you to the photo report

  • 100% completed raising the vertical to zero on the first section
  • reinforcement is mated, formwork is placed and concrete is placed on the 1st floor of the first section
  • completed work on the development of soil drainage

What has been done

Construction work on the site of the Premier Resort Hotel:

  • drilling works on the first section on the 5th aggression continue
  • installation of piles and drainage tray in the first section
  • partially mounted vertically in the first section
  • 3 sections of the foundation plate are poured

What has been done

Continue to report on construction work on the Premier Resort Hotel site:

  • 100% completed work to strengthen the retaining wall,
  • concreting slab 3 sections,
  • completed concreting of technical premises of the 1st section of the 2nd scarp,
  • 100% complete the knitting of piles in section 1.

What has been done

Continue to report on construction work on the Premier Resort Hotel site

  • the retaining wall anchoring process continues
  • preparatory work is carried out for the ventilation and chimney part of the boiler room
  • the slab of the 1st and 2nd step of the second section is flooded
  • the process of installing the columns of the first section continues.

What has been done

Dear Investors, we continue to inform you about the dynamics of the construction of the Premier Resort Hotel:

  • the work on the anchoring of the retaining wall is ongoing;
  • 100% complete roof overlay, staircase cell monolith of all balconies of the second sections
  • 90% of the aggregate masonry was completed in the second section,
  • the work on the bay piles is underway, preparation for concreting the first section of the first section is under way,
  • is preparing for bundles of reinforcement of the second ledge of the first section.

Stay up informed – be the first to learn about the “Premier Resort” news!

* No spam, notifications only

Get progress reports on the construction

Thank you, you will receive progress reports on the construction

Leave an application and we'll call you

Thank you!

Your message has been sent!